In the summer of 2021, the existing pool, which dated to 1964, was demolished. The following spring, work began on the all-new pool facility. Gateway provided full design and engineering support for the new facility.

The previous competition style pool was replaced with an activity pool. This new pool features a zero-entry walk-in with spray features and bubblers, a multi-purpose section of that allows for lap swimming, and the deep end of the pool includes a climbing wall, diving board, and double-flume slide. Additional elements of the project include renovations to the existing bathhouse and the construction of four (4) new structures:

• A two-story lifeguard and storage building,
• A dedicated pump room to house the pool mechanicals,
• A ticket booth, and
• A concession stand

Finally, Gateway’s design provided ADA accessibility for the entire site, including an all-new switchback ramp from street level. Other design features included decorative concrete, a shade sail over the small wading pool, rain gardens with plantings for stormwater management, site retaining walls, sunbathing areas, new safety guiderail and fencing, and LED lighting.

Serving as Whitehall Borough’s municipal engineer for over 65 years, Gateway Engineers’ knowledge of the community, its regulatory codes, and borough administration is second to none. Gateway provided the entire pool design team, incorporating many of our practice areas, to manage this project from its infancy through construction. The communication, coordination, and collaboration of the entire project team streamlined responses, reduced lag time, and provided the Borough with ongoing feedback and status reporting throughout the project lifecycle.

Project Info

Client Name
Whitehall Borough
Project Location
Whitehall Borough, PA
Year Completed
March 2022 – June 2023